Troubleshooting
The messages PALBONTradeFinance shows when it refuses something, what each means, and what to do. Messages are grouped by area; the part in quotes is what you see on screen.
1. Access and screens
| Message |
Meaning |
What to do |
| You do not have access to PALBONTradeFinance. |
You hold no trade role |
Ask an administrator for one (see Roles and access) |
| No action is open to you at this step. |
The next step belongs to another role, waits for a condition, or needs another approver |
Check the workflow page of the record type; ask the role named there |
| '…' is not open to you on this record now. |
The action is not available in the record's current state or to your roles |
Refresh the page; check the state |
| Only a System Manager can customize forms / design processes / design automations. |
Design is for System Managers |
Ask one |
| Only a Workspace Manager can change a dashboard everyone sees. Save it as your own copy instead. |
Shared dashboards are managed |
Use Save as my dashboard |
| A page shows a PALBON Suite AI is not configured message |
The AI service settings are missing on this site |
Ask the server administrator to set them (see First-time setup); everything else works |
2. Trades and contracts
| Message |
What to do |
| A back-to-back trade needs a purchase leg and a sale leg before it is confirmed. |
Add the missing leg |
| Row 1: a Purchase leg is with a Supplier. |
A purchase leg's party is a supplier; a sale leg's a customer |
| The laycan ends before it starts. |
Correct the laycan dates |
| Choose the contract type. |
Set Contract type (or a leg, which gives Purchase or Sale Contract) |
| A … needs: Commodity, Quantity, Base Price per Unit. |
The contract type needs these values |
| A … is a purchase or a sale: choose its leg. |
Long-term and offtake agreements need Leg |
| Contract type … is disabled. |
Choose another type, or re-enable it |
| … is finalized: change … through an addendum, so the approval and signature still match the terms. |
Add an Addenda row instead of editing (see Trade contracts) |
| Attach the signed copy (or send it for e-signature) before marking the contract signed. |
Attach Signed Copy or complete the e-signature |
| Only a finalized contract is sent for signature. |
Finalize first |
| E-signature is not set up yet… / PALBON Ekyc is not installed |
Configure Digio Settings, or upload the signed copy |
| … has no e-mail address. Add one on the …, or a contact, then send again. |
Add the counterparty's e-mail |
| A contract cannot be its own framework contract. / A contract cannot refer to itself. |
Choose another contract |
| Valid to is before valid from. |
Correct the period |
3. Letters of credit
| Message |
What to do |
| The credit expires before it is issued. / The latest shipment date is after the expiry. |
Correct the dates (31C, 31D, 44C) |
| … with tolerance takes facility … past its limit (… available). |
Choose another facility, reduce the amount, or have the limit raised |
| Select one bank quote, not 2. |
Untick all but one Selected |
| The payment tranches add up to 90%, not 100%. |
Correct the shares |
| … cannot go ahead: … is under a confirmed sanctions match / rejected at KYC. |
The risk gate: resolve the counterparty's screening or KYC first |
| There is no sale contract on this trade to compare with yet. |
Make the leg's contract first |
| No contract of this leg to take the new terms from. |
The amendment is proposed from the leg's contract |
| Presented after the deadline of …: the bank may refuse it as late. |
A warning; present sooner next time, or ask the applicant to accept |
| The refusal came after …: under UCP 600 art. 16f the bank may no longer refuse these documents. |
Insist on payment |
| SWIFT: Field 31D is missing. (in Problems Found) |
The pasted text is incomplete: paste the whole message, then Retry |
4. Shipping and laytime
| Message |
What to do |
| … is not a valid IMO number: seven digits whose last is the check digit. |
Check the IMO number |
| MMSI … must be nine digits. / Call sign … must be 3 to 9 letters or digits. |
Correct the identifier |
| UN/LOCODE … does not belong to … |
The LOCODE's first two letters are the country code |
| … is not a time zone name (for example Asia/Kolkata). |
Use a time zone name |
| Latitude must be between -90 and 90. |
Correct the position |
| Row 3 (Loading Commenced): it ends before it starts. |
Correct the event's times |
| The loading or discharging rate per day is needed. |
Fill Rate (MT per day) on the laytime calculation |
| There is no despatch or demurrage to note. |
The result is nil, or not calculated yet |
| Freight is not ours on these terms (FOB): the buyer charters the vessel. |
No freight invoices on F-terms |
| Set the shipowner and the freight rate first. / The advance is due on loading: record the bill of lading first. |
Fill the voyage's freight fields and B/L |
5. Documents
| Message |
What to do |
| Add the surveyor's e-mail address first. |
Fill Sent To or the surveyor's e-mail |
| The beneficiary of this leg issues its own invoice and certificate. |
Only the sale leg (beneficiary type Company) prepares your own documents |
| Make the sale leg's settlement first: the invoice is built from it. |
Create the sale settlement |
| Link the letter of credit first: the draft follows its 42C and 42A. |
Set the instruction's credit |
| The draft is drawn for the invoice amount: prepare or record the commercial invoice first. |
Prepare or record the invoice |
| A finding Consistency … B/L number that you think is a typing error |
B/L numbers are never accepted as typing errors; have the document corrected |
6. Settlement and accounting
| Message |
What to do |
| … is beyond the contract's rejection limit: the settlement is frozen until the buyer's waiver is recorded. |
Record the buyer's waiver, or cancel the settlement |
| The cargo is beyond the rejection limit: record the buyer's waiver before invoicing. |
As above |
| The total … is above the credit's maximum …: the bank will refuse the excess. |
Check the build-up; the credit may need an amendment |
| There is no USD to INR exchange rate for …. |
Add the rate in Currency Exchange |
| Set the company's default receivable / payable account first. |
Set it on the company |
| … is not submitted yet: an accountant submits it, then the payment can be recorded. |
Submit the invoice in PALBONSphere |
7. Treasury and risk
| Message |
What to do |
| B/L … already backs …: financing it twice is double financing. |
Cancel the second request |
| Bands 1-30 and 20-60 overlap. |
Correct the discount bands |
| The owners add up to 110%, more than 100%. |
Correct the ownership shares |
| The facility ends before it starts. |
Correct the facility's dates |
| Link the guarantee to its trade first (Reference: Trade). |
Set the guarantee's reference to its trade |
| Say what the amendment changes: the amount, the validity or the wording. |
Give at least one change for the MT767 |
8. Automations and workflows
| Message |
What to do |
| Choose the record type to create. / A webhook needs its address. |
Complete the rule |
| Row 2: row. needs "For Each Row Of". |
Choose the table the rule runs over |
| Row 2: write the link field and the field, e.g. company.company_name. |
Correct the Linked Field value |
| The condition cannot be used: … |
Correct the condition |
| Only a System Manager can let a rule run without the user's permissions. |
Leave the option off, or ask a System Manager |
| A rule shows Last run failed |
Open it: Last runs shows the error; Try on a record to test the fix |
9. Voice
| Message |
What to do |
| The microphone is blocked for this site. |
Allow it from the icon at the left of the address bar |
| Voice needs a secure address… |
Use https (or localhost) |
| This browser has no voice input. |
Use Chrome or Edge, or type |
| No microphone was found. |
Connect one |
| The assistant answers I did not catch what to do |
Rephrase with one of the example sentences |
10. Getting more help
- Every record's Activity shows who changed what and when; Workflow History shows every move.
- Administration › Audit › AI Action Log shows what the assistant understood.
- A System Manager sees technical errors in Desk's Error Log (
/app/error-log).